Campus distribution feeder upgrade

Medium voltage distribution upgrades for the University of Ottawa, including a new campus loop feeder, transformer replacement, and switchgear installation. The transformer replacement was completed within a 16-hour window, with the main changeover carried out over a weekend.

Bank of transformers replaced with a dry-core transformer in a 16-hour window
New loop feeder from Morisset main vault to power house: 15 kV XLPE 500 MCM cable and required splices
In-campus switching for isolation of one half of medium voltage switchgear
Installed new 13.2 kV switchgear and connected existing wiring
Changeover completed over a weekend
Client: University of Ottawa
Sector: Education